Flood resilience
Guidance on the code of practice for property flood resilience, published by CIRIA in 2021, defines flood resilience as: ‘The combination of flood resistance and flood recoverability.’ It defines flood resilience technologies as: ‘practical devices and techniques which improve the resilience of buildings to flooding.’
Code of practice for property flood resilience, Edition 2, published by CIRIA in 2020, defines property flood resilience as: ‘Flood resilience related to buildings within the curtilage of a property.’
The National Flood and Coastal Erosion Risk Management Strategy for England, Glossary, published by the Environment Agency in 2020, defines resilience as: ‘The capacity of people and places to plan for, better protect, respond to, and to recover from flooding and coastal change. Places can achieve this by: making the best land use and development choices, better protecting people and places, responding to and recovering from flooding and coastal change whilst all the time adapting to climate change.’
See also: Flood recoverability and flood resistance.
[edit] Related articles on Designing Buildings
- BREEAM Flood risk management.
- Building flood resilience.
- Environment Agency.
- Flood risk.
- Flood.
- Groundwater.
- Property flood resilience.
- Pumps and dewatering equipment.
- Resilience.
- River engineering.
- Sustainable urban drainage systems.
- Temporary flood defences.
- Water engineering.
- Water table.
- Workplace design – flood protection.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
















